Q: How often to maintain the escalator?
A:
Escalators, moving walks maintenance details
Week period | ||
every Two weeks | 1 | Maintenance operation (level, vibration, abnormal voice, etc.) |
2 | emergency switch | |
3 | Step pedal surface cleaning | |
4 | Inspect if there is damage comb groove panel, guide rail, comb plate, etc. | |
Every month | 5 | Oiling each chain and sprocket |
6 | Overhaul the installation status | |
7 | Maintenance of various parts of the upper machine room \ cleaning | |
8 | Maintenance of various parts of the control board ( switches, fuses, contactors, etc. ) | |
9 | Check for the condition of the motors, the magnetic brakes and the motor drive . | |
10 | Overhauling the gearbox oil | |
Every two months | 11 | Glass and rack installation |
12 | Comb groove panel and comb plate spacing between comb teeth | |
13 | Comb groove panel and skirting board spacing | |
14 | Lubrication of each rail | |
Every six months | 15 | Cleaning of lower machinery and skirt board |
16 | Tensioning the drive chain | |
17 | Handrail guide | |
18 | Lubrication of handrail chain and tensioner | |
19 | Oiling at the front axle ring | |
20 | Lubricate each bearing ( upper and lower end gears, handrail drive, drive wheels, etc. ) | |
21 | Handrail guide overhaul | |
Every year | 22 | Installation status of exterior decoration |
23 | Internal maintenance of the switches on the operation panel | |
24 | Driver Gear Lubrication and Gear Box Cover Fixing Screws | |
25 | Decomposition and cleaning of magnetic brake | |
26 | Eraser for pedal pulley split ring |
Q: What’s you should do after you finish the mechanical installation?
A:
It has been adjusted when leaving the factory. If no fault is reported on the site, only fine adjustment is required, and generally no self-learning
For example, the switch is in place and the escalator is in place.
After the site installation, first remove the garbage on the escalator and guide rails, and then perform operation debugging to see if there are abnormal noises, and observe the operation of the handrails, steps, etc.
Before the escalator is officially opened, the step chain needs to be manually added with lubricating oil, and it can be put into use.
Q: What is the first step you should do after receive the escalator ?
A:
The hoisting tool depends on the site conditions. Generally, a crane is used. Under limited conditions, a manual hoist can be used as a support frame.