Hanson EME technology new project in Changsha
1. Dismantle all the original internal parts, keep the original decoration, the construction period is 2 days 2. Cleaning and paint refreshing, the construction period is 1 day, and it takes 2 days to dry the paint 3. 5 engineers put into the installation, the construction period is 8 working days 4. Does not affect the normal operation of merchant
Nigeria Enugu Airport Project
HANSON provides reliable multiple products and services for global users.
Korea Subway Project Daegokssa Metro Line 3 to 4
vertical heights are respectively 20250mm, 20300mm, 24510mm and 24533mm,the inclination is 30° and the step width is 1000mm.
Tokyo International Cruise Terminal (Olympic Support Project-Tokyo Odaiba)
30 degree , 1000 mm , rise height 6600mm, speed : 0.5m/s
Taiwan Jinhua City Center
30 degree, 1000mm, rise height 3100mm, speed: 0.5m/s
Korea Dinosaur Park
30 Degree, 1000mm, Rise height 16700mm, Speed: 0.5m/s
Daegu Metro Line 3
Public outdoor type; TH: 11179mm; Degree: 30°; step width: 600 mm; speed: 0.5
Seoul Train Station
Public indoor type; TH: 15430 mm; degree: 30 °, step width: 1000 mm; speed: 0.5
Japan 13 number Butou Terminal
Public Indoor; TH: 6600 mm; degree: 30°; step width: 1000 mm, speed: 0.5